required vide appendix-1 (c) Extra rate for use of black trap, basalt or granite is payable as per item 733. 3. Though separate rate for centring, shuttering and formwork has been ... the boxes of internal size 35x25 and 40 cm depth shall be used for measuring sand and aggregate. (a) The proportion of materials for nominal mix shall be used as ...
2. Shuttering in concrete construction is used as a mould for a structure in which fresh concrete is poured to harden subsequently curing It is a part of formwork, or you may call it as derivative of formwork. Shuttering is a vertical temporary arrangement which is arranged to bring concrete in a desired shape. or Formwork which supports vertical arrangement is known …
• To calculate labor strength & equipment required for Project Planning. • To fix up labor contract rates. ... +91 9950461810 Quantity of Coarse Aggregate, Sand and Cement for various proportion • Quantities shall be calculated for 10 cum of concrete. • Exact quantities of ingredients cannot be calculated for 10 cum of concrete so there ...
Shuttering rate per sqm. In India, The typical Shuttering rate (cost) with labour charges for Reinforced concrete (RCC) structure (column, beam & slab) is range from 430-540 rupees per sqm (square meter or m2). These cost includes labour cost for shuttering (215-250 rupees per square meter) plus bar bending cost (55 rupees/ square meter) plus labour cost to pour …
Labours: Say 64 bags Labour for mixing, transportation and placing concrete, including curing 10 300 m3 3000 Volume of sand required = 2/7 x 15.2 Cost of hiring mixture and vibrator L.S. 750 4.34 Labour for bending, cutting, placing reinforcement steel 785 5 Kg 3925 Volume of aggregate required = 4/7 x 15.2 Labour for centering and shuttering L ...
Quantity of aggregate = 4/7 ×1.54 × 35.3147 = 31 cft, so 31 cft aggregate quantity required for 1m3 m15 grade of concrete. If market rate of aggregate is consider INR 60 per cft, then cost of 31 cft aggregate = 31 × 60 = INR 1860, so cost of aggregate for 1m3 of m15 concrete = INR 1860. ... Shuttering component is not considered as the ...
Determine the mass (kg/m3) of free water, cement and aggregate required in the following mix • Characteristic strength = 45MPa at 28 days with 80 mm slump Crushed coarse aggregates (max size 20 mm, relative density of aggregate 27), uncrushed fine aggregates • Normal Portland cement Stage Item Values 45 N/mmat 28 days 1 1.1 Characteristic strength Proportion …
This temporary structure is called formwork or shuttering. Requirements of Formwork or Shuttering. Good formwork or shuttering structures should satisfy the following requirements: It should be strong enough to resist the pressure or the weight of the fresh concrete and the superimposed loads due to equipments, men etc, if any.
Risk Assessment Of-Shuttering-Deshuttering - Free download as PDF File (.pdf), Text File (.txt) or view presentation slides online. This document provides a hazard identification and risk assessment for shutter/de-shuttering work during the construction of a 380kV substation and transmission line project. It identifies potential harms from the work including harm to people's …
Transportation, New York Construction Materials Association, Inc., American Concrete Pavement Association, and New York City Concrete Promotional Council. It is intended as a guide for quality control and quality assurance sampling and testing of aggregate for compliance with the Department's friction aggregate specifications.
aggregate of 40 mm nominal size, in foundation and floors, retaining ... and bailing out water where ever required with all materials and labour complete but excluding the cost of cement and shuttering as per drawings and technical specifications as directed by Engineer 460.00 1547.96 1 cum 712061.60 ... 15 195030 Centring and shuttering ...
Shuttering required for Hand Rail=5.52m 2. No. of Hand Rails = 4. Total shuttering required for Hand Rails = 4 x 5.52 = 22.08m 2. Total Shuttering Required for Staircase = Waist Slab Shuttering + Steps shuttering+ Landing shuttering+HandRail shuttering. The total shuttering required for staircase = 10.77+4.5+3.735+22.08 = 41.085m 2. Liked the ...
Calculation of Quantity of Fine Aggregate- Given Ratio of Cement : Sand : Aggregate = 1 : 1 : 2- Quantity of Fine Aggregate = (Volume of Concrete x (1/4) x 2) / (1+2)- Quantity of Fine Aggregate = (55.685 x 0.5 x 2) / 3 = 18.56 m^3Therefore, the quantity of fine aggregate required for construction of a circular water tank of 3.5 m diameter and ...
Shuttering techniques are designed to cater to the specific requirements of various structural components, such as foundation, column, wall, and slab shuttering. Each technique utilizes specific materials and thicknesses, ensuring that the resulting concrete structures meet the desired strength and quality standards.
Following table specifies requirements of M-15 concrete mix design as per IS-10262-2009 and MORT&H (Ministry of Road Transport and Highways.) M-15 CONCRETE MIX DESIGN ... Proportion of Volume of Coarse Aggregate & Fine Aggregate Content: 1. Vol. of C.A. as per table 3 of IS 10262: 62.00%: 2. Adopted Vol. of Coarse Aggregate: 65.00%: Adopted Vol ...
This document provides a rate analysis for shuttering work for a floor beam and slab project with a shuttering area of 180 square meters. It lists 15 line items with descriptions of materials and labor needed, quantities, unit rates, total costs, and costs per square meter. The total cost per square meter is Rs. 213.03 and adding 10% contractor's profit brings the final rate to Rs. 244.98 per ...
The document discusses the methodology and procedures for conventional shuttering and concreting work. It defines various terminology used in formwork, including formwork, falsework, scaffolding, sheeting, joists, bearers, props, wedges, studs, soldiers, yokes, stop-ends, back forms, bracings, tie bolts, and ribands. It explains the purpose and function of each component …
PRESENTATION ON SHUTTERING.pptx - Free download as Powerpoint Presentation (.ppt / .pptx), PDF File (.pdf), Text File (.txt) or view presentation slides online. This project report summarizes modern formwork systems used in construction. It discusses the objectives of formwork, requirements of a good system, and types including conventional timber, steel, and …
Answer / mrinal bose. Approximate Shuttering value 1:8.88 it is standard shuttering volume. The standard column size 300 mm X 450 mm, Slab thk is 125 mm, plinth beam 230 mm X 350 mm, Beam/ slab beam 230 mm X 450 and foundation shuttering will less then above average shuttering quantity 8.88 Sqm per cubic meter
a) Bags of cement required: Volume of cement required for 1m 3 of Concrete = =0.28 m 3 Then number of bags of cement (volume of one bag of cement = 0.0347 m 3) = = 8.07 bags of cement. b) Volume of Sand required: Volume of sand required = = 0.42 m 3 of sand. c) Volume of Coarse Aggregate Required Volume of Coarse Aggregate = = 0.84 m 3 of ...
1320 kg of 20mm Aggregate is required for 1 cu.m of M-15 grade concrete. 146 litres of water is required for 1 cu.m of M-15 grade concrete. M-20 grade. concrete. 8 bags of cement required for 1 cu.m of M-20 grade. concrete. 693 kg of Sand required for 1 cu.m of M-20 grade concrete. 1344 kg of 20mm Aggregate is required for 1 cu.m of M-20 grade ...
Shuttering and Formwork: Shuttering and formwork are essential for providing support and molding the concrete slab. The cost of shuttering and formwork can range from Rs. 100 to Rs. 200 per square meter. ... The amount of course aggregate required for a 1500 RCC roof slab depends on various factors such as the size of the slab, the concrete mix ...
These Concrete Calculators provide the required quantities of cement and all-in ballast or cement, sharp sand and gravel required to give a defined volume of finished concrete. Both of these concrete calculators make an allowance for the fact that material losses volume after being mixed to make concrete.