DS421 is a self-contained cable-bolting rig for rock reinforcement in underground mines and tunnels with small and medium cross-sections. The full bolting cycle can be operated by one person working safely under the canopy or in a soundproof, air-conditioned cabin. ... SE-811 81 en, Sweden Tel +46 (0)26 260000. Other ...
As a successor of the first fully mechanized cable-bolting rig known as Cabolt, the all-new DS421 benefits from the legacy of three decades of first-class cable bolters. ... The new DS421 is designed especially for rock reinforcement in underground mines and tunnels with small and medium cross sections. With a working width of 3.9 ...
diameter bolting cable storage capacity. With a hole diameter range of 51–76 mm and 32 m mechanized drilling hole depth, Cabletec E can also be used as a secondary production drill rig. A fully mechanized cable bolting drill rig for drilling and installation of cable bolts up to 25 m in length. Quality assured cable bolting Main benefits
JENNMAR offers the industry's most proven combination bolt system in the mining industry by providing ultimate tension in weak strata. View Details. Conventional Mechanical Bolts. All systems are configured with high strength bar: - (Grade 55 (55,000 psi minimum yield) - (Grade 75 (75,000 psi minimum yield) ... from increasing the lifespan of ...
The annual consumption of bolting systems exceeds 7 million in Australia and 500 million worldwide. 1 Although understanding of the ground supporting mechanism of a bolting system has improved over recent decades, many ground failure incidents have been reported to be associated with cable bolt failure,2, 3, 4 which can be normally classified ...
DS422i is a rock support drill designed for cement-grouted cable bolt installation in underground mines and tunnels. The bolter can install up to 25 meter long cable bolts with several steel strands per hole and has an onboard automatic cement mixer and cement silo. ... Designed with safety in mind This cable bolter is designed for ...
Cable Bolt. 270 ksi, low relaxation cable per ASTM A416. Supplied in any length, black or galvanized cable. Point anchored active bolt, tensioned after installation utilizing the hydraulic tensioning jack. Point-anchored passive bolt with pre-seated head. Wedge barrel shaped to accept 1-1/8" hex or square male spinner.
In the present day, cable bolts are widely used in different excavation projects. Deep underground mining can sometimes result in rock failures. Cable bolting is effective for preventing rock displacement and reinforcing the anchoring structure underground. At Mining & Civil Integrity Testing, we specialise in Cable Bold Non-Destructive Testing ...
There are underground mines all over the world presenting a kaleidoscope of methods and equipment. There are approximately 650 underground mines, each with an annual output that exceeds 150,000 tonnes, which account for 90% of the ore output of the western world. ... The cable shovel is widely used in surface mining. High operating and ...
The 1-2-3-layer support system is often used in deep mines and underground caverns of large span, such as underground machine halls in hydropower plants. This support system is characterised by its flexibility in order to adapt to the prevailing rock condition. In civil tunnels, cable bolting is less used than in mining excavations.
This includes the Proceedings of the international symposium, Abisko, Sweden, 28 August-2 September 1983. Rock bolts today represent the dominant support system in mines and underground structures. Some results and experiences are discussed to give a better understanding of the strength of individual rock bolts and systems of bolts, and the interaction …
Fixed length, dynamic type cables have also been successfully installed using the cable bolting rig. A dynamic cable bolt refers to a cable where a portion of the bolt length is encased in a plastic tube so that it is not in contact with the grout and can stretch along this length in response to ground movement. STEP 1: A hole is
states: "Offering excellent safety, serviceability and efficiency – with a record of 13,000 metres of grouted cable bolts per month – the one man operated DS421 is a true boost for productivity." The new DS421 is designed especially for rock reinforcement in underground mines and tunnels with small and medium cross sections.
Our products are designed for Australian underground mining conditions and are manufactured and warehoused in Australia at locations close to each of the major underground coal mining regions. ... 70T 10 Wire Hollow Cable Bolt. Product Specifications. 70T 12 Wire Sumo Cable Bolt. Product Specifications. Bottom-Up 100 MPa Grout. Product ...
Cable bolts are flexible anchors used in both underground and open-pit mining to stabilize and control large rock masses and slopes, allowing for adjustable loads based on the number of cables used.. Our cable bolts are made from 1860MPa grade steel cables, available in both single and bulb varieties. They offer high tensile strength, excellent shear capacity, and superior …
Cable bolting is another technique that offers additional support to the rock during mining and tunneling projects.. Cable bolts are long, grouted reinforcement tools that help support and stabilize the rock mass above the profile of a tunnel deep underground.. For years, the mining community would use resin cartridges to inject resins around bolting for rock reinforcement.
Cabletec SL is a fully mechanized cable bolting drill rig for drilling and installation of cable bolts up to 6 m in length in low profile applications. Download the technical specification to read more. ... Epiroc's cable bolting rig is a fully mechanized rig for long-hole drilling and cable bolting in underground mining applications. Its ...
UNDERGROUND MINING GUIDE How to Cut Downtime and Extend Cable Life Underground mining cable care and maintenance Anaconda® Brand mining cables have been designed to reduce cable-related downtime, as this factor represents a serious impact to mine profitability. This booklet represents a timely, updated body of knowledge for underground mining ...
Immediately supporting mechanized cable bolting rig would make wider use of cable bolting in underground mines possible. The aim of this Master's Thesis was to evaluate the idea of mechanized installation of tensioned active cable bolts instead of rigid bolts. The main interest was focused on the restrictions and alternatives of mechanically ...
Cable Bolt Background Cable Bolts have been used extensively in underground mines since the early 1970's. introduced HACETTEPE UNIVERSITY Department of Mining Engineering Prepared by Ersin DİK 3/18 At that time, modified cable bolts was developed to improve the load transfer and was into both Underground and Open pit Mines.
Transport / bolting width 2 730 mm / 3 290 mm Transport height 3 050 mm Transport / bolting length 13 500 mm / 13 700 mm Total weight 29 000 kg depending on options 1. DS422 i - CABLE BOLTER DS422i CABLE BOLTER DS422i is a rock reinforcement drill rig specialized for cement grouted cable-bolt installation in underground mines ...